( ! ) Deprecated: Function WP_Dependencies-&gt;add_data() was called with an argument that is <strong>deprecated</strong> since version 6.9.0! IE conditional comments are ignored by all supported browsers. in /home/building.kiev.ua/public_html/wp-includes/functions.php on line 6131
Call Stack
#TimeMemoryFunctionLocation
10.0001360160{main}( ).../index.php:0
20.0002360520require( '/home/building.kiev.ua/public_html/wp-blog-header.php' ).../index.php:17
30.755712419208require_once( '/home/building.kiev.ua/public_html/wp-includes/template-loader.php' ).../wp-blog-header.php:19
40.775512730288include( '/home/building.kiev.ua/public_html/wp-content/themes/rttheme18/page.php' ).../template-loader.php:125
50.775512730288get_header( ).../page.php:8
60.775512748480locate_template( ).../general-template.php:48
70.775512748592load_template( ).../template.php:749
80.775812749152require_once( '/home/building.kiev.ua/public_html/wp-content/themes/rttheme18/header.php' ).../template.php:814
90.776712759232wp_head( ).../header.php:10
100.776712759232do_action( ).../general-template.php:3197
110.776712759608WP_Hook->do_action( ).../plugin.php:522
120.776712759608WP_Hook->apply_filters( ).../class-wp-hook.php:365
130.776812762064wp_enqueue_scripts( ).../class-wp-hook.php:341
140.776812762064do_action( ).../script-loader.php:2311
150.776812762440WP_Hook->do_action( ).../plugin.php:522
160.776812762440WP_Hook->apply_filters( ).../class-wp-hook.php:365
170.991214115880RTThemeSite->load_styles( ).../class-wp-hook.php:341
180.991414120408WP_Styles->add_data( ).../theme.php:104
190.991414120408WP_Styles->add_data( ).../class-wp-styles.php:385
200.991514120408_deprecated_argument( ).../class-wp-dependencies.php:296
210.991514120728wp_trigger_error( ).../functions.php:5925
220.991714120912trigger_error ( ).../functions.php:6131

( ! ) Deprecated: Function WP_Dependencies-&gt;add_data() was called with an argument that is <strong>deprecated</strong> since version 6.9.0! IE conditional comments are ignored by all supported browsers. in /home/building.kiev.ua/public_html/wp-includes/functions.php on line 6131
Call Stack
#TimeMemoryFunctionLocation
10.0001360160{main}( ).../index.php:0
20.0002360520require( '/home/building.kiev.ua/public_html/wp-blog-header.php' ).../index.php:17
30.755712419208require_once( '/home/building.kiev.ua/public_html/wp-includes/template-loader.php' ).../wp-blog-header.php:19
40.775512730288include( '/home/building.kiev.ua/public_html/wp-content/themes/rttheme18/page.php' ).../template-loader.php:125
50.775512730288get_header( ).../page.php:8
60.775512748480locate_template( ).../general-template.php:48
70.775512748592load_template( ).../template.php:749
80.775812749152require_once( '/home/building.kiev.ua/public_html/wp-content/themes/rttheme18/header.php' ).../template.php:814
90.776712759232wp_head( ).../header.php:10
100.776712759232do_action( ).../general-template.php:3197
110.776712759608WP_Hook->do_action( ).../plugin.php:522
120.776712759608WP_Hook->apply_filters( ).../class-wp-hook.php:365
130.776812762064wp_enqueue_scripts( ).../class-wp-hook.php:341
140.776812762064do_action( ).../script-loader.php:2311
150.776812762440WP_Hook->do_action( ).../plugin.php:522
160.776812762440WP_Hook->apply_filters( ).../class-wp-hook.php:365
170.991214115880RTThemeSite->load_styles( ).../class-wp-hook.php:341
180.993214134520WP_Styles->add_data( ).../theme.php:108
190.993214134520WP_Styles->add_data( ).../class-wp-styles.php:385
200.993214134520_deprecated_argument( ).../class-wp-dependencies.php:296
210.993214134840wp_trigger_error( ).../functions.php:5925
220.993314135064trigger_error ( ).../functions.php:6131
Boiler Rooms, Water Heating Stations, Heat Substations, Heating Networks - Remvodplast Plus

Boiler Rooms, Water Heating Stations, Heat Substations, Heating Networks

Boiler Rooms, Water Heating Stations, Heat Substations, Heating Networks

Customer – UKS ‘Donetsk City Council’

‘Construction of an autonomous boiler room of secondary school 63 in Kuibyshev district of Donetsk’.


Customer – Kramatorsk Heat Network

selection and supply of individual heating stations;

installation of technological pipelines;

installation and adjustment of automation networks, internal and external power supply, lighting;

Software development of the dispatching system, organization of communication channels.


Customer – municipal institution ‘Agency for local economic development of the city of Ladyzhyn’

Installation of individual heating stations in residential and public facilities on the territory of Ladyzhyn City Council, Vinnytsia region, Ladyzhyn, Kindergarten ‘Fairy Tale’, Pryberezhny microdistrict, bldg. 1. Execution of works on installation and adjustment of heating networks.


Customer – Executive Committee of the Mining City Council

‘Reconstruction of the heating system of the village’ Sokil ‘Shakhtarsk, located at: Donetsk region, Shakhtarsk, Serdyte village, street Polova, 22 ‘.
‘Transfer of a coal container boiler room to gas for heating of secondary school 13, Shakhtarsk – reconstruction’.


Customer – Municipal Institution ‘Municipal Construction’ of Makeyevka City Council

‘Reconstruction of the boiler room 5 on the street. Kovalevska, located at: Makeyevka, Kirovsky district, street Kovalevskaya, 1a ».


Customer – KKP ‘Donetskteplomerezha’

Transfer of coal boilers of communal enterprises of Donetsk to solid biofuels. Reconstruction of the boiler room on the street. Lipetska, 2 in the Proletarsky district of Donetsk.


Customer – KKP ‘Donetskteplomerezha’

Construction and installation work on the introduction of a cogeneration unit on the boiler room on the street. Ionina, 9-B in Donetsk.

construction and installation works on the introduction of the cogeneration unit SAT-1000 at the Kryvozubova-4 boiler house (Kirovsky Heat District) in Donetsk.


Customer – Municipal Institution ‘Municipal Construction’ of Makeyevka City Council

“Reconstruction of the boiler room 8 171 quarter, located at: Makeyevka, Radyanskyi district, street Chkalova, 3a ».


Customer – Municipal Institution ‘Municipal Construction’ of Makeyevka City Council

‘Reconstruction of the boiler room 2 60 quarter, located at: Makeyevka, Soviet district, united village, quarter 60, 4a’.


Customer – KP ‘Teplomerezha’

‘Reconstruction of the boiler room on the street. Makeyevivska, 4 in the Proletarsky district of Donetsk. ‘
‘Reconstruction of the boiler room on the street. Lipetska, 2 in the Proletarsky district of Donetsk.
‘Reconstruction of the boiler room of secondary school 151 in Mospyne, Proletarsky district of Donetsk.’


Customer – KU ‘Municipal construction’ of Makeyevka city council

Project: ‘Implementation of equipment for cleaning the gas-dust flow (cyclones such as CN-15) at 3 boiler houses (boiler of the city hospital 4 in the village of Kholodna Balka)’.
Performed works: ‘Installation of flues, smoke extractors and groups of 4 cyclones CN-15 with a capacity of 2500 m / day.’


Customer – KP ‘Teplomerezha’

‘Reconstruction of the boiler room on the street. Sportivna, 8a in Mospyne, Proletarsky district of Donetsk ‘.


Customer – Department of Housing and Communal Services of the Executive Committee of Donetsk Region

‘Reconstruction of the boiler room 3 in Amvrosiyivka with the introduction of heat utilizers, energy efficient pumps and gas burner devices.’
‘Reconstruction of the boiler room of the residential district’ D ‘Yenakieve with the introduction of heat recyclers, energy efficient pumps and gas burner devices.’
‘Reconstruction of the boiler room 2 with the introduction of energy efficient boilers, pumps and gas burner devices.’


Customer – Department of Housing and Communal Services of the Executive Committee of Donetsk Region

‘Construction of a boiler room, heat supply networks and GVP of the regional antitumor center in the city of Donetsk’.


Customer – Kramatorsk Heat Network

Installation of 25 individual heating points in the residential district ‘Lazurny’ Kramatorsk.


Customer – Donetskteplomerezha checkpoint

Reconstruction of central heating stations and boilers with the introduction of frequency converters and automatic control and scheduling systems of 42 objects.


Customer – PJSC ‘Metinvest Engineering’ (Enakiyevo Metallurgical Plant)

Installation of ITP, GWP networks and air heating supply.


Customer – KP Department of Capital Construction of the City of Makeyevka

Construction of the Kommunar boiler house, Makeyevka city.

galochkaOur company is a full member of the
"Ukrainian Association of water supply and sanitation sector “UKRVODOKANALEKOLOGIYA”"