( ! ) Deprecated: Function WP_Dependencies-&gt;add_data() was called with an argument that is <strong>deprecated</strong> since version 6.9.0! IE conditional comments are ignored by all supported browsers. in /home/building.kiev.ua/public_html/wp-includes/functions.php on line 6131
Call Stack
#TimeMemoryFunctionLocation
10.0001359904{main}( ).../index.php:0
20.0002360264require( '/home/building.kiev.ua/public_html/wp-blog-header.php' ).../index.php:17
30.590512410312require_once( '/home/building.kiev.ua/public_html/wp-includes/template-loader.php' ).../wp-blog-header.php:19
40.614312720784include( '/home/building.kiev.ua/public_html/wp-content/themes/rttheme18/page.php' ).../template-loader.php:125
50.614312720784get_header( ).../page.php:8
60.614312738976locate_template( ).../general-template.php:48
70.614312739088load_template( ).../template.php:749
80.614412739536require_once( '/home/building.kiev.ua/public_html/wp-content/themes/rttheme18/header.php' ).../template.php:814
90.615112749616wp_head( ).../header.php:10
100.615112749616do_action( ).../general-template.php:3197
110.615112749992WP_Hook->do_action( ).../plugin.php:522
120.615112749992WP_Hook->apply_filters( ).../class-wp-hook.php:365
130.615112752448wp_enqueue_scripts( ).../class-wp-hook.php:341
140.615112752448do_action( ).../script-loader.php:2311
150.615112752824WP_Hook->do_action( ).../plugin.php:522
160.615112752824WP_Hook->apply_filters( ).../class-wp-hook.php:365
170.772413962736RTThemeSite->load_styles( ).../class-wp-hook.php:341
180.772613967264WP_Styles->add_data( ).../theme.php:104
190.772613967264WP_Styles->add_data( ).../class-wp-styles.php:385
200.772713967264_deprecated_argument( ).../class-wp-dependencies.php:296
210.772713967584wp_trigger_error( ).../functions.php:5925
220.772913967768trigger_error ( ).../functions.php:6131

( ! ) Deprecated: Function WP_Dependencies-&gt;add_data() was called with an argument that is <strong>deprecated</strong> since version 6.9.0! IE conditional comments are ignored by all supported browsers. in /home/building.kiev.ua/public_html/wp-includes/functions.php on line 6131
Call Stack
#TimeMemoryFunctionLocation
10.0001359904{main}( ).../index.php:0
20.0002360264require( '/home/building.kiev.ua/public_html/wp-blog-header.php' ).../index.php:17
30.590512410312require_once( '/home/building.kiev.ua/public_html/wp-includes/template-loader.php' ).../wp-blog-header.php:19
40.614312720784include( '/home/building.kiev.ua/public_html/wp-content/themes/rttheme18/page.php' ).../template-loader.php:125
50.614312720784get_header( ).../page.php:8
60.614312738976locate_template( ).../general-template.php:48
70.614312739088load_template( ).../template.php:749
80.614412739536require_once( '/home/building.kiev.ua/public_html/wp-content/themes/rttheme18/header.php' ).../template.php:814
90.615112749616wp_head( ).../header.php:10
100.615112749616do_action( ).../general-template.php:3197
110.615112749992WP_Hook->do_action( ).../plugin.php:522
120.615112749992WP_Hook->apply_filters( ).../class-wp-hook.php:365
130.615112752448wp_enqueue_scripts( ).../class-wp-hook.php:341
140.615112752448do_action( ).../script-loader.php:2311
150.615112752824WP_Hook->do_action( ).../plugin.php:522
160.615112752824WP_Hook->apply_filters( ).../class-wp-hook.php:365
170.772413962736RTThemeSite->load_styles( ).../class-wp-hook.php:341
180.774513981376WP_Styles->add_data( ).../theme.php:108
190.774513981376WP_Styles->add_data( ).../class-wp-styles.php:385
200.774513981376_deprecated_argument( ).../class-wp-dependencies.php:296
210.774513981696wp_trigger_error( ).../functions.php:5925
220.774613981920trigger_error ( ).../functions.php:6131
Quarry and Mine Design - Remvodplast Plus

Quarry and Mine Design

Private enterprise ‘Remvodplast Plus’ performs design work in the following areas:

  •   Comprehensive quarry design: working project, mining project, reclamation and biological reclamation project, environmental impact assessment;
  •   Development of feasibility study of industrial development of refractory, ceramic, flux raw materials and other minerals;
  •   Development of projects for the conservation of quarries of refractory, ceramic, flux raw materials and other minerals;
  •   Development of quarry liquidation projects;
  •   Development of technical and design documentation for technological lines of grinding of refractory clays, kaolins, crushing and sorting of rocks;
  •   Adjustment of working projects for the development of mineral deposits with the replacement of technologies for working with modern ones;
  •   Development of feasibility study;
  •   Development of instructions for geological support of mining in quarries;
  •   Development of instructions on definition, accounting and rationing of losses of minerals at their extraction by an open way;
  •   Development of feasibility studies of measures to protect the environment from the negative impact of production;
  •   Calculation of emissions and dispersion of pollutants and preparation of projects of the emission permit for enterprises;
  •   Development of projects of aspiration systems and dust collecting devices;
  •   Development of industrial waste landfill projects.

Project work is performed Qualified employees who have modern software, such as: Geovia Surpac, have certificates of design engineers. Our team successfully works with the enterprises part of UMG Holding, with the company ‘Smart-Nerudprom’, PJSC ‘Chasovoyarsky refractory plant’, LLC ‘Knauf Gypsum Donbass’, PJSC ‘HeidelbergCement Ukraine’, SE ‘Rutex Keram’ LLC ‘Rutex Keram’.
In 2011-2014 The creative team performed:

  •   Working project ‘Careers of the site 1 of the Dobropilske deposit of refractory and refractory clays’;
  •   Working project ‘Carrier of the section 2 of Dobropilsky deposit of refractory and refractory clays’;
  •   Project ‘Technological highway for the transportation of clays, Dobropil district of Donetsk region’;
  •   Project ‘Career Conservation’ South ‘ of the western part of the Novoraysky field of refractory clays ‘;
  •   Adjustment of working projects of quarries ‘Eastern’ and ‘South-West’ PJSC ‘Druzhkivske ore management’;
  •   Adjustment of projects of biological reclamation of lands disturbed by mining works on quarries 1, 2 and 3 with the involvement of quarry 4 of PJSC ‘Voronopornerud’ in the development of quarry stocks;
  •   Working project ‘Development of sites’ Rozivka ‘,’ Clay-quarry ‘and the north-eastern part of the western deposits of the Popasnyansky deposit of refractory clays’;
  •   The project of the mining allotment ‘Development of sites’ Rozivka ‘,’ Glynoquar ‘and the north-eastern part of the western deposits of the Popasnyansky deposit of refractory clays’;
  •   Working project ‘Career for the development of the field’ Experimental ‘Refractory and refractory clays’;
  •   The project of conservation of the East Pokrovsky quarry of LLC ‘KNAUF GIPS DONBAS’;
  •   Adjustment of the working project for the development of the East Mikhailovsky gypsum deposit LLC ‘KNAUF GIPS DONBAS’;
  •   Project ‘Pulp of limestones of PC LLC’ Vids ‘in Dokuchaevsk, Volnovakha district, Donetsk region’;
  •   Working project: ‘Increasing the capacity of the automobile dump of overburden’ Western ‘at the quarry’ Central ‘to support the capacity of PJSC’ DFDK ‘;
  •   Working documentation for the testing of reserves in the northern part of the Anatolsky field as part of the Working Project of Quarry Finalization (2nd stage) for granite mining of the Anatolian deposit of the State Enterprise ‘Donetsk Oblavtodor’;
  •   The project of a mining branch for development of a biryuchsky deposit of refractory clays;
  •   The project of conservation of the site ‘Western 1’ of Andriyivskyi refractory clays deposit of PJSC ‘VESCO’;
  •   Project ‘Drainage of Karpov Mel and Mergel Quarry of PJSC’ HeidelbergCement Ukraine, Amvrosiyivskyi district of Donetsk region;
  •   Working project ‘Maintenance of the production capacity of the quarry’ Northern – shaping ‘on the extraction of molding sands of PJSC’ Chasovoyarsky refractory plant ‘;
  •   Working project ‘Accessation and testing of the quarry at the site ‘Block 1’ of the Chasovoyarsk deposit of refractory clays to maintain the capacity of clay mining with subsequent involvement in the testing of molding sands ‘;
  •   The project of conservation of the style quarry of PJSC ‘DFDK’;
  •   Adjustment of the working project ‘Dissection and testing of the northern section of the Psilerahske limestone deposit to maintain capacity’;
  •   Pivdenny quarry liquidation project of PJSC ‘Komsomolske RU’;
  •   Working project for the development of the Vikninsky kaolin deposit.

under development:

  •   Working project ‘Carrier of the site 3 of Dobropilsky deposit of refractory and refractory clays’;
  •   adjustment of the working project of the quarry 1 PJSC ‘Druzhkivske ore management’;
  •   Working project for the reconstruction of the Maddhapara Hard Rock Mine mine to ensure the production capacity of granite mining and processing of at least 1.8 million tons per year;
  •   Working projects for the reconstruction of Chkalovsky 1, Chkalovsky 2, Northern, Zaporizhia, Pokrovsky quarries of PJSC ‘GOGZK’.

galochkaOur company is a full member of the
"Ukrainian Association of water supply and sanitation sector “UKRVODOKANALEKOLOGIYA”"