Power Supply, Lighting, ICS, SCS
Customer and operating organization – KP ‘Slavic Trolleybus Department’ of the Slovyansk City Council
- Reconstruction of the power supply of the traction substation 5 on the street Modern, 17a, Slovyansk.
Customer – Airliquide (France)
- Lighting of the production site of the gas production plant in the city of Yenakiieve.
Customer – LLC ‘Golden Heap’
- Installation and adjustment of the 10 / 0.4 substation for the Pivdenna fan zone (preparation for Euro-2012).
Customer – Department of Capital Construction of Donetsk City Executive Committee
- Installation and adjustment of the 10 / 0.4 2 × 1000 kW substation for power supply to the UEFA hospitality zone (preparation for Euro-2012).
Customer – PJSC ‘Azovstal’
- Installation and adjustment of the Beregova substation, installation of cables, RU-6 and RU-0.4.
Customer – PJSC ‘Alchevskkoks’
- Installation and adjustment of the substation, cable products and pumps in the pumping station of the reversible cycle.
Customer – PJSC ‘Kramatorsk Metallurgical Plant’
- Installation of power and control cables of the blast furnace 2.
Customer – ‘Mine Management Pokrovske’, ‘Donetskstal’ Corporation
- Construction of substation 110 / 6,3 / 6,6 (11,4) kV VPS 3 (block 11).
Customer – LLC ‘HERZ SMU’
- restoration of the power cable at the traffic light object 2 (Polotska Street – Auchan Shopping Center).
- Replacement of traffic lights on the ‘School’ section. Installation of new traffic lights.
Customer – Druzhkivka City Council
- Installation and adjustment of the substation 6 / 0.4 1000 kW of the Ice Palace of Sports in Druzhkivka.
Customer – PE Yarovy
- Installation and adjustment of the substation 6 / 0.4 1000 kW of the administrative building (4 floors) on the street Izotova.
The customer is PJSC ‘Donbasenergo’, ‘Electroremont’
- Overhaul of the smoke extractor of the foundry shop D-12 (inv. 4227). Dismantling and installation of equipment, reconstruction of the aspiration system.
Customer – CJSC ‘Sarmat’
- internal electrical networks and lighting;
- installation and certification of intra-factory SCS;
- Installation of technological pipelines.
Customer – SE ‘Tobacco company’ Hamadei ”
- installation of technological pipelines;
- software development, adjustment of ACS TP;
- Installation and adjustment of internal and external electric networks and lighting.
Customer – LLC ‘Kapakhim’
- Installation and adjustment of automation systems, internal and external power supply.
Customer – LLC ‘Donbaskeramika’
- External power supply of the rail warehouse with a line of dry enrichment of kaolin (Volnovakha, 100th anniversary of the Red Cross).
Customer – Donetsk concrete plant ‘Frigate’
- Reconstruction of the enterprise’s power supply.
Customer – TsGB Khartsyzsk
- Reconstruction of emergency power supply networks of operating rooms and maternity wards of the building 5 (164 Krasnoznamenska Street).
Customer – PJSC ‘YMZ’
- Laying fiber optic communication lines, installation and connection of passive SCS equipment.
Customer – LLC ‘Metinvest Engineering’
- Installation of equipment and pipelines, commissioning of the equipment of the power part of the building of the dust and preparation department (PPO) of installations for the preparation and injection of pulverized coal (PVP) in the blast furnace 1, 3, 5 within the framework the project:
“Construction of installations for injecting pulverized coal in the blast furnace No. 1, 3 and 5 of PJSC “EMZ” (I, II starting complexes)”.
- Installation and commissioning of energy networks within the project:
‘Construction of a complex of installation for injecting pulverized coal in the blast furnace 1, 3 and 5 PJSC’ EMZ ‘”.
- installation of pipelines and equipment of the energy part of the RU RU 3, valve stand 3, RU DP 5, valve stand 5, boiler, ventilation systems of the bunker overpass, reloading units, PU-4, PU-5, as well as natural gas pipelines, external water supply pipelines, sewerage and heating networks, heating systems RU-3, RU-5, VS-3, modular pumping station 2 (installation of pumps and ventilation) and pipelines blast furnace gas.
- Automation of oxygen supply and ARP nitrogen supply within the project:
‘Construction of the complex of installation for injecting pulverized coal fuel in the blast furnace 1, 3 and 5 of PJSC’ EMZ ‘(I, II launch complexes)”.
Customer – TsGB Khartsyzsk
- ‘Reconstruction of the existing emergency power supply networks of the operating room and the maternity hall of the building 5 on the street Chervonopraporna, 164 KU TsGB Khartsyzsk with the installation of emergency power systems ”
Our company is a full member of the
"Ukrainian Association of water supply and sanitation sector “UKRVODOKANALEKOLOGIYA”"